GANGHOFER PRIMARY SCHOOL, EXPANSION FROM 3 TO 4 STREAMS (CLASSES PER GRADE)

Unterschleißheim

Conceptual investigation of four utilization variants in the primary school as a feasibility study with area comparison and cost estimation. School supervisory approval. Floor area approx. 3,200 sqm Service phases: Feasibility study, cost volume for renovation and structural adjustment · Cost volume approx. € 3.5 million.

Client: City of Unterschleißheim

2023-2025

NEW CONSTRUCTION OF HOUSE F AT OBERE SEELEITE

Steinebach am Wörthsee

New construction of a holiday/residential home in solid wood construction with an exposed concrete basement on a hillside, on the high bank of Lake Wörthsee with lake access. Floor area approx. 180 sqm Service phases 1-8 · Cost volume approx. € 0.75 million.

Client: Christian Fehl, Germering

2018-2025

NEW CONSTRUCTION OF AUTOHAUS CHRISTL SERVICE CENTER

Neuried b. München

New construction of an automotive service center with a mechanical workshop, body shop, paint shop, washing bay, and parking deck with PV roofing and 46 parking spaces, reinforced concrete construction with solid exterior walls, ETICS (thermal insulation). Floor area approx. 3,200 sqm Service phases 1-8 · Cost volume approx. € 10.5 million.

Client: Christl Holding GmbH & Co. KG, Munich

2024

STAFF HOUSING AT SALBERGHAUS: RESTRUCTURING AND EXPANSION

Putzbrunn

Building within existing structures: Development of a sustainable construction process as a circular economy using selective dismantling, material re-use, adaptive reuse, and upgrading. CO2-neutral construction project with conceptual character, planned awarding of research contracts by the Federal Ministry for Housing, Urban Development and Building. Cost estimation, integrative construction process. Floor area approx. 2,800 sqm Service phases 1-2 · Cost volume approx. € 8.2 million.

Client: Catholic Youth Welfare of the Archdiocese of Munich and Freising e.V.

2023-2024

FUNERAL HALL ON NELKENSTRASSE

Unterschleißheim

Renovation of the roof surfaces, replacement of the windows as part of a maintenance measure. Use of subsidies. Service phases 1-8 · Cost volume approx. € 0.3 million. Client: City of Unterschleißheim

2022-2024 DAYCARE CENTER WITH 4 GROUPS IN THE SALBERGHAUS Putzbrunn New construction of a daycare center for integration and inclusion. Prefabricated timber facade as a timber frame structure with a reinforced concrete load-bearing structure, underfloor heating, PV system on a green roof. Floor area 1,012 sqm Service phases 1-8 · Cost volume approx. € 4.2 million.

Client: Catholic Youth Welfare of the Archdiocese of Munich and Freising e.V.

2022-2024

NEW CONSTRUCTION OF AUTOHAUS BIERSCHNEIDER

Manching

New construction of showroom, offices, workshop, commercial vehicle workshop, parts warehouse, and washing bay. Realization as an "energy-efficient new commercial building", reinforced concrete skeleton with reinforced concrete slabs and exterior walls, heat pumps; measure located in the Danube water protection area. Use of subsidies. Floor area approx. 4,500 sqm Service phases 3-8 · Cost volume approx. € 8.8 million.

Client: Bacher Hoch- u. Tiefbau GmbH, Ingolstadt

2021-2024 RESTRUCTURING OF RETAIL UNIT TAL20 (LISTED BUILDING)

Munich

Change of use, conversion, and interior design of a traditional Munich shop. Heritage-listed building. Floor area approx. 160 sqm Service phases 1-8 · Cost volume approx. € 0.85 million.

Client: Georg Huber, Munich

2018-2024

TECHNICAL UNIVERSITY OF MUNICH

Munich

Building maintenance measures for the partially heritage-listed building complex. Implementation of fire protection, escape routes, and roof renovation during ongoing operations, with extensive electrical engineering and pollutant contamination. Service phases 1-8 · Cost volume approx. € 5.3 million.

Client: State Building Authority Munich 2

2018-2024

NEW CONSTRUCTION OF A RESIDENTIAL COMPLEX WITH 16 UNITS AND UNDERGROUND PARKING

Munich

New construction of a residential complex as an "energy-efficient new residential building", use of subsidies, brick construction with supporting structure and fire protection in in-situ concrete, partition walls as prefabricated reinforced concrete parts, PV system, heat pumps, fire protection, increased sound insulation requirements. Floor area approx. 1,500 sqm, underground parking 16 spaces Service phases 1-7, general contractor awarding · Cost volume approx. € 5.4 million.

Client: Ankoglstraße 2 GmbH & Co. KG, Brenner family, Munich

2021-2023

NEW CONSTRUCTION OF MARITIM HOTEL WITH CONGRESS CENTER INGOLSTADT Ingolstadt

New construction of a hotel with 223 rooms and suites and an adjoining congress center. Construction-accompanying planning and tendering for the general contractor for the building envelope, master builder, windows, mullion-transom facade, natural stone facade and roof cladding, and flat roof waterproofing. Documentation. Service phases 3, 5-7 · Cost volume approx. € 48 million.

Client: Bacher Hoch- u. Tiefbau GmbH, Ingolstadt

2021-2023

VERTICAL EXTENSION OF RESIDENTIAL BUILDING AND NEW COURTYARD DEVELOPMENT (LISTED BUILDING)

Munich

Vertical extension of a heritage-listed residential and commercial building in solid wood construction incl. urban densification as a new courtyard development in Munich's old town, in a pedestrian zone (Sendlingerstraße). Floor area approx. 1,000 sqm Service phases 1-7 · Cost volume approx. € 4.8 million.

Client: Moll Immobilien Management GmbH representing the University of Music and Performing Arts Munich

2020-2023

RESTRUCTURING OF RESIDENTIAL UNITS TAL20 (LISTED BUILDING)

Munich

Conversion and renovation of a heritage-listed residential and commercial building in Munich's old town. Apartment renovation, fire protection renovation, facade reconstruction. Floor area approx. 500 sqm Service phases 1-8 · Cost volume approx. € 0.65 million.

Client: Georg Huber, Munich

2022

AUDI GW+ USED CAR SALES AREA WITH MODULAR BUILDING

Freising

Implementation of the Audi GW+ used car concept. Modular building in metal construction with salesperson workstations and delivery room. Display areas and exterior lighting, signage. Outdoor areas approx. 2,500 sqm, modular building approx. 70 sqm Service phases 1-8 · Cost volume approx. € 0.4 million.

Client: Christian Schowalter, Freising

2022

AUTOHAUS CHRISTL & SCHOWALTER

Munich

New Brand Design Volkswagen Re-design of showroom and sales offices with a central info counter, interventions in the load-bearing structure, installation of underfloor cable ducts, implementation of lighting concept, new furniture concept. Construction time 6 weeks. Floor area approx. 1,800 sqm Service phases 1-8 · Cost volume approx. € 0.85 million.

Client: Christl GmbH & Co. KG, Munich

2019-2022

STATE MINISTRY FOR ENVIRONMENT AND CONSUMER PROTECTION

Munich

Energy-efficient renovation of the exterior facade windows and conversion/redesign of the ministry area, of the Bavarian State Ministry for Environment and Consumer Protection, Rosenkavalierplatz 2, during ongoing operations under high safety requirements and asbestos contamination. Service phases 1-9 · Cost volume approx. € 8.6 million.

Client: State Building Authority Munich 1

2008-2022

POLICE HEADQUARTERS

Munich

Renovation of the heritage-listed Munich Police Headquarters building, Löwengrube section. Interim measures laboratory containers, Criminal Investigation Service (KDD), Emergency Response (EKD), detention center, new underground parking, police command staff, and installation of a firewall during ongoing police operations in 4 construction phases with high security requirements. Gross floor area approx. 12,700 m² · Service phases 2-8 · Cost volume approx. € 26.00 million.

Client: State Building Authority Munich 1

2018-2022

MULTI-FAMILY HOUSE

Munich

New construction of a 6-family house with underground garage and storage extension, including adaptation of the development plan in Oberschleißheim. Gross floor area approx. 1,500 m² Service phases 1-4 · Cost volume approx. € 4.5 million.

Client: Gerhardt Kunstwadl

2021

CHANGE OF USE FROM CARE HOME DIRECTOR'S RESIDENCE TO THERAPEUTIC DAYCARE

Putzbrunn

Change of use of a care home director's residence into a curative education/therapeutic daycare center as an interim measure. Floor area approx. 500 sqm Service phases 1-8 · Cost volume approx. € 0.15 million.

Client: Catholic Youth Welfare of the Archdiocese of Munich and Freising e.V.

2020-2021

FORMER WOMEN'S CLINIC PRIEN

Prien a. Chiemsee

Restructuring and change of use. Approval and implementation. Floor area approx. 1,000 sqm Service phases 2-4 · Cost volume approx. € 10.1 million.

Client: Klinik Prien GmbH & Co. KG

2018-2021

MUNICH UNIVERSITY OF APPLIED SCIENCES

Munich

Fire protection measures in the heritage-listed building of the Munich University of Applied Sciences Karlstraße 6 - Kanter Old and New. Based on historical models, connecting doors and fixed glazing were replaced in the main stairwells in 3 construction phases and adapted to current fire protection requirements. Service phases 1-8 · Cost volume approx. € 1.1 million.

Client: State Building Authority Munich 2

2018-2020

GUARDHOUSE

Munich

New construction of a guardhouse with high security requirements and redesign of the property entrance. Gross floor area approx. 150 m² · Service phases 5-9 · Cost volume approx. € 2.0 million.

Client: State Building Authority Freising

2016-2019

POLICE STATION

Munich

New construction of a police station PI45 in Pasing, Heimburgstraße 19 for approx. 100 employees. Office building with police courtyard, holding cells, staff changing rooms, barrier-free access, concrete core activation, and groundwater heat pump, with high security requirements. Gross floor area approx. 2,700 m² · Service phases 3 (proportional), 5-9 · Cost volume approx. € 9.5 million.

Client: State Building Authority Munich 1

2015-2018

PRIMARY AND SECONDARY SCHOOL

Munich

Building maintenance measures, renovation of sanitary facilities, moisture damage, and fire protection of the heritage-listed primary and secondary school at Implerstraße 35, during ongoing school operations in 3 construction phases. Gross floor area approx. 1,150 m² · Service phases 2-9 · Cost volume approx. € 3.5 million.

Client: City of Munich, Building Department H5

2014-2017

MINISTRY OF THE INTERIOR

Munich

Bavarian State Ministry of the Interior Odeonsplatz 3, creation of command rooms for the Police Command Staff and Bavarian Disaster Control, meeting room for the Strategic Task Force and emergency power supply (NEA), during ongoing operations in 2 construction phases with high security requirements. Gross floor area approx. 2,200 m² · Service phases 2-8 · Cost volume approx. € 6.4 million.

Client: State Building Authority Munich 1

2013-2017

RESIDENTIAL COMPLEX WITH COMMERCIAL UNITS AND UNDERGROUND PARKING Munich

Planning and implementation of 26 apartments from 70-160m², 2 maisonette apartments, penthouse, 3 commercial units, 29 parking spaces in the underground garage, barrier-free access, connection to the existing building. Gross floor area approx. 3,800 m² · Service phases 2-8 · Cost volume approx. € 8.5 million.

Client: Gustav Moll Vermögensverwaltung GmbH & Co. KG

2016 THEATER HALL

Munich

Renovation of a theater hall, ceiling design with integrated lighting/stage and sound technology, as well as integrated fire protection. Gross floor area approx. 600 m² · Service phases 1-8 · Cost volume approx. € 700,000.

Client: MÜNCHENSTIFT GmbH

2016

CAR DEALERSHIP

Freising

Redesign of the showroom with customer zone according to the Audi Corporate Architecture 2016 guidelines, fire protection, HVAC and electrical renovation, work carried out during ongoing operations. Gross floor area approx. 800 m² · Service phases 2-8 · Cost volume approx. € 700,000.

Client: Autohaus Freising Schowalter GmbH & Co. KG

2015-2016

KINDERGARTEN

Munich New construction of a kindergarten pavilion with 3 groups, multi-purpose room, and catering kitchen. Gross floor area approx. 680 m² · Service phases 2-9 · Cost volume approx. € 3.2 million.

Client: City of Munich, Building Department H5

2015-2016

SECONDARY SCHOOL

Munich New construction of a school pavilion for primary/secondary school for the Impler School. Gross floor area approx. 650 m² · Service phases 2-9 · Cost volume approx. € 2.9 million.

Client: City of Munich, Building Department H5

2014-2016

CAR DEALERSHIP

Munich

New construction of a car dealership according to SEAT Corporate Guidelines 2016 with showroom, workshop, and body shop with 16 workstations, underground garage with 100 parking spaces, tire storage, staff area. Gross floor area approx. 3,750 m² · Service phases 2-8 · Cost volume approx. € 4.8 million.

Client: Kölbl Grundstücks GmbH & Co. KG

2013-2015

RETIREMENT AND NURSING HOME

Munich

New construction of the nursing home on Tauernstraße with approx. 200 places for nursing care and assisted living. Gross floor area approx. 15,800 m² · Service phases 1-2 · Cost volume approx. € 32.3 million.

Client: City of Munich, Building Department H22

2014

RETIREMENT AND NURSING HOME

Munich

Conversion of a nursing floor into assisted living units. Gross floor area approx. 2,600 m² · Service phases 2-5 · Cost volume approx. € 700,000.

Client: Münchenstift GmbH

2014

BUNDESWEHR CAREER CENTER

Munich

Preparation of the Bundeswehr Career Center Munich for the Medical Academy of the Ernst-von-Bergmann Barracks. Gross floor area approx. 8,200 m² · Service phases 2-3 · Cost volume approx. € 15 million.

Client: State Building Authority Munich 1

2013-2014

UNIVERSITY

Freising Window replacement in the Löwentor building, Weihenstephan-Triesdorf University of Applied Sciences. Gross floor area approx. 1,900 m² · Service phases 3-8 · Cost volume approx. € 600,000.

Client: State Building Authority Freising

2013-2014

VEHICLE PREPARATION CENTER

Garching

New construction of the vehicle preparation center in Garching near Munich: Preparation, body construction with paint shop, car wash and petrol station, administration building. Gross floor area approx. 8,300 m² · Gross volume approx. 60,000 m³ · Service phases 1-8 · Construction time approx. 6 months · Cost volume approx. € 9.0 million.

Client: FABCO GmbH & Co. KG

2012-2014

HIGH-RISE FACADE

Changchun

Hotel, office, shopping complex, design and master planning facade, building height 130m. Gross floor area approx. 45,000 m² · Service phases 3-5, master planning · Cost volume approx. € 67.5 million. Client: German Engineering Technology (Beijing) Ltd.

2012-2014

THERAPY WING SALBERGHAUS

Putzbrunn

Developmental therapeutic home for toddlers: Structural improvement through renovation and vertical extension of the therapy wing, 2 residential groups, sports and therapy areas, conversion and renovation measures during ongoing operations, application for subsidies. Gross floor area approx. 1,500 m² · Service phases 1-8 · Cost volume approx. € 2.1 million.

Client: Catholic Youth Welfare of the Archdiocese of Munich and Freising e.V.

2012-2013

GRAMMAR SCHOOL

Munich

Functional renovation part 2 of the Maria-Theresia-Gymnasium at Regerplatz. Gross floor area approx. 630 m² · Service phases 3-8 · Cost volume approx. € 1.7 million.

Client: City of Munich, Building Department H3

2011-2012

GRAMMAR SCHOOL

Munich Renovation of facade/windows, Functional renovation part 1 of the Maria-Theresia-Gymnasium at Regerplatz. Gross floor area approx. 7,200 m² · Service phases 1-2 · Cost volume approx. € 5.7 million.

Client: City of Munich, Building Department H3

2012

POLICE HEADQUARTERS

Munich

Conversion of transformer room into police operation training rooms. Gross floor area approx. 500 m² · Service phases 2-8 · Cost volume approx. € 450,000.

Client: State Building Authority Munich 1

2010-2012

CAR DEALERSHIP

Munich Restructuring and renovation of workshop, tire rack storage, fire protection concept. Gross floor area approx. 2,500 m² · Service phases 2-8 · Cost volume approx. € 2.20 million.

Client: Autohaus Christl GmbH & Co.KG

2009-2012

OFFICE BUILDING

Munich

New construction of an office and commercial building with an underground garage on Frankfurter Ring. Gross floor area approx. 13,400 m² · Service phases 2-8 · Cost volume approx. € 16.5 million.

Client: VINCITA GmbH

2010-2011

PARTS CENTER

Garching

New construction of a parts center with sales area, training workshop, and training rooms in Garching. Gross floor area approx. 4,000 m² · Service phases 2-8 · Cost volume approx. € 5.00 million.

Client: Müno Immobilien GmbH

2005-2009

NURSING HOME

Munich

General renovation of the Heilig Geist fully inpatient care facility. Gross floor area approx. 18,900 m² · Service phases 1-8 · Cost volume approx. € 28.40 million.

Client: MÜNCHENSTIFT GmbH

2008

PRIVATE CLINIC

Munich

Renovation of the private ward of the Josephinum Private Clinic. Gross floor area approx. 580 m² · Service phases 2-8 · Cost volume approx. € 1.10 million.

Client: Privatklinik Josephinum

2007-2008

CRECHE (DAYCARE)

Putzbrunn

Conversion of existing building structures into a creche with two groups. Usable area approx. 250 m² · Service phases 1-8 · Cost volume approx. € 325,000.

Client: Salberghaus Putzbrunn

2006-2007

NURSING HOME

Munich

Implementation of the food supply concept with new residential group kitchens, cafeteria, implementation of fire protection measures during ongoing operations. Gross floor area approx. 17,500 m² · Service phases 1-8 · Cost volume approx. € 3.50 million.

Client: MÜNCHENSTIFT GmbH

2003-2007

PRIMARY SCHOOL

Munich

General refurbishment of the heritage-listed Gebelestrasse primary school with the new construction of a single sports hall and a daycare center in 2 construction phases. Gross floor area approx. 12,400 m² · Service phases 6-9, Health and Safety Coordination (SIGEKO) · Cost volume approx. € 24.00 million.

Client: City of Munich, Building Department H3

2006

AFTER-SCHOOL CARE AND CRECHE

Munich

Preliminary planning for implementation, integration of after-school care and creche into a heritage-listed building. Gross floor area approx. 1,250 m² · Service phases 1-2 · Cost volume approx. € 2.65 million.

Client: City of Munich, Building Department H24

2003-2006

HOTEL

Oberschleißheim

New construction and structural improvement of the ***Superior Hotel am Schlosspark. Gross floor area approx. 4,600 m² · Service phases 1-8, general planning · Cost volume approx. € 5.40 million.

Client: Hotel am Schlosspark

2005

MULTI-FAMILY HOUSE

Feldkirchen

Planning and implementation of 12 condominiums, user-specific individual fit-out, underground garage. Usable area approx. 620 m² · Service phases 2-8 · Cost volume approx. € 1.25 million.

Client: B. Bauer GmbH & Co. KG

2005

NURSING HOME

Munich

New construction of a fully inpatient care facility on Effnerstrasse. Gross floor area approx. 15,300 m² · Service phases 1-2 · Cost volume approx. € 22.00 million.

Client: City of Munich, Building Department H2

2001-2005

DAYCARE CENTER

Munich

Conversion and extension of the existing Riegerhofweg daycare center. Gross floor area approx. 2,500 m² · Service phases 2-8 · Cost volume approx. € 4.10 million.

Client: City of Munich, Building Department H3

2004

CAR DEALERSHIP

Freising

Implementation of Audi Corporate Architecture elements for Autohaus Schowalter. Service phases 1-8 · Cost volume approx. € 125,000.

Client: Autohaus Schowalter GmbH & Co.KG

 

1999-2004

CHILDREN'S HOME

Putzbrunn

Developmental therapeutic home Salberghaus for toddlers, application for subsidies, structural improvement of residential and emergency shelter groups. Gross floor area approx. 3,500 m² · Service phases 1-8, general planning · Cost volume: approx. € 3.67 million.

Client: Catholic Youth Welfare of the Archdiocese of Munich and Freising e.V.

2003

OFFICE BUILDING

Augsburg

Concept planning for the restructuring, leasing, and renovation of an office building on Ernst-Reuter-Platz. Gross floor area approx. 1,300 m² · Service phase 2, special services, service phases 1-8, general planning Cost volume approx. € 1.02 million.

Client: Allianz Immobilien GmbH Munich

2002-2003

ADMINISTRATION AND RESIDENTIAL BUILDING

Munich

Change of use. Gross floor area approx. 2,300 m² · Service phases 3-8, inventory · Cost volume approx. € 2.04 million.

Client: Catholic Youth Welfare of the Archdiocese of Munich and Freising e.V.

1999-2000, 2003

HEALTH CENTER

Prien am Chiemsee

New construction/extension of the Prien Health Center, Dr. Lehnert Women's Clinic with OR department, outpatient clinic, and nursing care during ongoing operations. Gross floor area approx. 2,000 m² · Preliminary building request, Service phases 1-8 · Cost volume: approx. € 2.65 million.

Client: Gesundheitszentrum Prien Management GmbH

1993-98, 2001-2002

INTERDISCIPLINARY THERAPY CENTER

Waren/Müritz

Renovation and structural improvement of the acute clinic with 120 beds, new construction of the state infectious disease department, examination and treatment area with 2 ORs, and emergency procedure rooms, as well as rehabilitation clinic with 120 beds, physical therapy with brine pool. Gross floor area approx. 25,000 m² · Service phases 1-8, additional order 2001 · Cost volume € 42.66 million.

Client: Klinik Amsee/VIB AG

1999-2001

CAR DEALERSHIP

Munich

Implementation of Volkswagen Corporate Architecture in the context of a structural improvement for Autohaus Christl. Gross floor area approx. 2,000 m² · Service phases 1-8, general planning · Cost volume approx. € 2.05 million.

Client: Autohaus Christl

1999-2001

BRANCH OFFICE

Munich

Planning concept for the expansion of the AOK Direktion Pasing. Gross floor area approx. 3,000 m² · Preliminary building request, Service phases 1-3 · Cost volume approx. € 3.85 million.

Client: AOK Bayern

1999

COMMERCIAL BUILDING

Munich

Modernization and conversion of a commercial building. Gross floor area approx. 550 m² · Service phases 1-8, general planning · Cost volume approx. € 0.51 million.

Client: Monachia Immobilien GmbH Grundstücksverwertungs OHG, Munich

1999

TRAINING CENTER

Dingolfing

New construction of a BMW vocational training center at the Dingolfing site, training workshop for engines, bodywork, and service, training area for IT, planning report 1999, 2nd prize. Gross floor area approx. 13,200 m² · Planning report · Estimated construction costs approx. € 12.8 million.

Client: BMW AG Munich TD P-1

1996-97

PRIVATE SURGICAL CLINIC

Munich-Perlach

Planning concept for the conversion of an office building into a private surgical clinic, preliminary investigation, concept planning with cost estimate. Gross volume approx. 54,100 m³ · Special services, structural concepts · Cost volume: approx. € 21.47 million.

Client: Ing.-Büro Mühlberger

1996-97

PRIVATE SURGICAL CLINIC

Munich-Bogenhausen Renovation of the nursing wards with 107 beds, OR department, and functional rooms during ongoing clinic operations. Gross floor area approx. 2,900 m² · Service phases 1-8 · Cost volume approx. € 3.10 million.

Client: VIB AG, Nuremberg

1995-97

INTERNAL MEDICINE CLINIC

Munich

Renovation and immediate measures for the Dr. Müller Internal Medicine Clinic, integration of an intensive care unit into an existing part of the building, installation of cold storage cells, measures taken during ongoing clinic operations, construction time 3 months, building structure from the 1950s. Gross floor area approx. 400 m² · Service phases 1-8 · Cost volume approx. € 0.92 million.

Client: Dr. Heinrich Müller

1995-96

CASTLE (MANOR)

Henfenfeld

Renovation and conversion of Henfenfeld Castle, administration, seminar, and training rooms, original building structure from the 16th-18th centuries. Gross floor area approx. 3,200 m² · Service phases 1-8 · Cost volume approx. € 3.10 million.

Client: Fritz Mayer, Nuremberg, private

1995-96

TRAINING CENTER WITH HOTEL

Hersbruck

New construction of an education and training center with hotel, training area with auditorium (400 seats), wellness area. Invited competition 1995, 1st prize. Gross floor area approx. 14,000 m² · Service phases 1-4, project-related development plan Cost volume approx. € 42.44 million.

Client: TQM AG, Henfenfeld

1992-1995

COMMERCIAL BUILDING

Aschheim

New construction of an office and commercial building with an underground garage. Service phases 1-7 · Cost volume € 1.53 million.

Client: Gustav Kimmig

bottom of page